Draft client turnover companion · Zero Trust Preparation · 6 October 2026
Prepare one selected access use case for a defensible next decision. This guide connects authoritative references to client facts, current investments, conceptual options, ownership and a proposed validation plan. It does not replace the standards or create a separate Zero Trust methodology. The outcome can be a qualified option, a narrower next scope or a documented hold. It is not pillar scoring, maturity certification, demonstrated control effectiveness or an authorization outcome.
Inputs can come from Foundations or equivalent standalone evidence. Neither Foundations nor Application Dependency Mapping is a required purchase. The existing module is zero-trust in pursue/services/modules.json; its quantities, specialist participation, handling and review arrangements must be agreed before work. This pack adds no offering, engine field or schema. The existing 30 requests, 51 positions, 10 domains and 53 workstreams remain unchanged.
1. Establish the boundary and the receiving decision
Record the selected service, access problem, resource/data, identity populations, security boundary and explicit exclusions. Name the service owner, qualified Zero Trust/security specialist, policy representative, receiving custodian and client acceptance authority. Identify identity, endpoint, network, application/data and operations reviewers; do not assume one consultant covers all specialties. Confirm permitted evidence, access method, storage, retention and return arrangements before inspecting material.
Fictional example: an approved group of analysts accesses a retained reporting service across a cloud/GSS boundary. The service also uses a workload identity to read a data store. The selected question is whether current access decisions and enforcement can support the proposed access policy without breaking essential service dependencies. The human session and service-to-data call are separate flows. Backup, monitoring, administration and emergency paths are identified as dependencies or exclusions, not silently treated as covered.
Define quantities and decision expectations without inventing dates or duration. A bounded preparation package can disclose unknowns and still meet agreed artifact criteria. Missing data permission stops the affected evidence work. Missing specialist or policy input changes the supportable conclusion; it does not become an assumed favorable answer. Keep a record of who agreed to narrow, defer or proceed with a qualified scope.
2. Reference exact sources and record client applicability
NIST SP 800-207, August 2020, provides the conceptual anchor: section 2.1 describes Zero Trust tenets; section 3 separates policy engine, policy administrator and enforcement point; sections 7.3.1–7.3.5 address actors, assets, processes, candidate policies and solution selection. Network location alone is not a basis for implicit trust. These references guide discussion; client authorities determine applicable requirements and authorization conditions. (NIST publication and full text)
| Reference | Exact location to consult | Use and qualification |
|---|---|---|
| NIST SP 800-207, August 2020 | Sections 2.1, 3 and 7.3.1–7.3.5; printed pages 6–7, 9–10 and 38–40 | Common terminology and preparation questions; not a product checklist or consultant-issued mandate |
| DoD Zero Trust Strategy, October 2022 | “Vision,” printed p.4 | Strategic context. Official indexed passage inspected; full retrieval failed. Obtain the client-adopted authoritative copy before detailed mapping. |
| DoD Zero Trust Reference Architecture v2.0, July 2022 | Cover/version verified; detailed section mapping remains unknown until authoritative copy review | Architectural reference lead, not a claim that this is the latest applicable edition |
| DoD Zero Trust Execution Roadmap v1.1 | Confirm the linked edition and printed page before client use | Earlier indexed date/page attribution is disputed by independent review; the full official PDF could not be retrieved for reconciliation. No client deadline or completion score is derived |
| NSA ZIG live User capability page, retrieved October 6, 2026 | Activity 1.1.1, “Inventory User” | Exact activity reference for identity-source and inventory discussion |
| NSA ZIG live Application and Workload page, retrieved October 6, 2026 | Activity 3.1.1, “Application and Code Identification” | Exact activity reference for application/version/ownership context |
DoD references: Strategy, Reference architecture v2.0, Roadmap v1.1. These are versioned research references, not a verified complete inventory of current policy. Record later component direction or conflicting editions for the responsible client authority to resolve.
NSA released its Primer and Discovery guidance January 14, 2026, followed by Phase One and Phase Two January 30, 2026. Its May 28, 2026 portal launch provides current activity-level access. The PDF downloads returned access errors during research; official HTML activity pages were readable. Use those precise page headings and retrieval dates, not invented PDF page numbers. The portal identifies its alignment with the defense CIO framework; its implementation suggestions should not be converted into universal product mandates. (January release, Phase release, ZIG portal)
Maintain one row per claimed requirement: issuer, title, edition/date, exact section/activity, source location, client applicability rationale, confirming authority, decision status and linked flow. A source can be guidance without being an adopted requirement. Keep FedCiv, DoD and IC applicability separate; do not transfer roadmap dates or authority from one population to another. This bounded pack does not establish FedCiv/IC policy applicability. The client supplies its applicable directives and adoption record.
3. Describe current trust before proposing products
The following are our recommended preparation records, tailored with client specialists rather than copied implementation instructions. Give each statement an evidence reference, date, scope and state: declared, observed, inferred, unknown or contradicted. An existing diagram is a declaration until its relevant relationships are corroborated; an export reflects its collection period and filters. Owner validation establishes business meaning, while technical evidence supports the described mechanism.
| Selected-flow record | Questions to resolve |
|---|---|
| Subject and identity | Human or workload? Authoritative identity source, owner, lifecycle, privilege and credential type? Record references, never secrets. |
| Resource and data | Exact service/resource and intended operation? Data owner, sensitivity determination and allowed purpose? |
| Device/workload context | What state is used, who supplies it, how fresh is it and what happens when unavailable? |
| Trust decision | Where is authentication distinguished from permission for this resource/action? Which policy and inputs are actually consulted? |
| Enforcement | Which component can permit, deny or terminate this path? What bypass, local account or alternate route remains? |
| Evidence and operations | Which permitted records connect request, decision and outcome? Who monitors, maintains and troubleshoots the path? |
For the fictional reporting service, distinguish the analyst's identity from the application's database identity. Successful user authentication does not establish the permissions of the downstream workload. Record whether access uses local or federated identities and where ownership or credential lifecycle is uncertain. Do not infer that a gateway governs a direct administrative or service route merely because it fronts the user interface.
NSA's Activity 1.1.1 identifies authoritative identity sources and lifecycle context, including privileged identities; Activity 3.1.1 calls for application/code inventory context such as versions, ownership, hosting and support. Consult the original activities for their detail. This module inspects agreed existing records; it does not execute their discovery or implementation tasks. (User activity 1.1.1, Application activity 3.1.1)
Map responsibility separately from capability. The provider, GSS operator, identity team, application owner, data owner and CSSP can have different duties. Record evidence for common-control or service inheritance and its exclusions. An available feature or supplier statement does not demonstrate that the client configured, inherited or operates it.
Current arrangement
Describe trust and responsibility today
Interim option
Show constraints and retained duties
Future candidate
Identify prerequisites and specialist review
Parallel alternatives for review, not an automatic maturity progression. Preserve exceptions, unknowns and degraded behavior.
4. Compare options, exceptions and degraded behavior
Start with the existing investment inventory: product/service, version, entitlement, owner, known interfaces, boundary and evidence of use. Classify each option as retain, configure, integrate, acquire or investigate. A missing owner or unclear policy is not automatically a software gap. A feature missing from the current entitlement requires an acquisition decision, not an assumption that a new tool is already funded.
For each selected flow, compare the current arrangement, an interim option and a future design candidate against the same question. Record dependencies, affected users/workloads, anticipated benefit, operational burden, compatibility, uncertainty and reason to reject or defer. These are conceptual options for specialist review; provide no live policy syntax, privileged-access changes or deployment commands.
| Condition | Proposed decision record |
|---|---|
| Normal access | Intended subject/resource/action, required context, policy authority and expected outcome |
| Exception | Specific deviation, justification, compensating proposal, approving authority, scope, owner, expiry and review trigger |
| Break-glass | Mission condition, eligible role, activation authority, bounded privilege/time, audit, notification and restoration of normal controls |
| Degraded operation | Lost identity service, stale posture, unavailable decision component or lost telemetry; intended behavior, mission consequences and authorized recovery |
| Revocation or change | Identity departure, privilege change, compromised credential or changed resource sensitivity; decision owner and evidence needed to verify the response |
Do not choose a universal fail-open or fail-closed rule. Show the security and mission consequences, then assign the policy decision to the appropriate authority. Temporary access is not acceptable merely because it expires; its scope, monitoring and approval must be justified. A monitoring outage can remove required evidence even while access still works. Where required evidence is absent and no interim arrangement is accepted, affected design or authorization decisions remain held.
For our fictional case, an identity-provider outage raises two distinct questions: whether existing analyst sessions may continue and whether the workload can continue database access. The answer depends on current policy, dependency state and mission tolerance. The preparation output is a decision record and unresolved questions, not a fabricated emergency procedure. Any later engineering or operational exception requires separately authorized work.
5. Propose validation without claiming execution
Define a later validation question for each material assumption. Record proposed environment, sample, prerequisites, permissions, qualified operator, expected observations, stop condition and accepting reviewer. Leave results unknown and execution status “not executed.” A tabletop can review a plan but cannot establish control effectiveness. A product demonstration cannot establish the client's integrated behavior.
| Proposed case | Observation to request in separately authorized validation |
|---|---|
| Permitted human access | Decision and enforcement records agree for the selected resource/action |
| Valid identity, disallowed action | Resource permission is evaluated independently of authentication success |
| Workload identity lifecycle change | Approved change/revocation behavior is visible along the selected downstream path |
| Stale or absent context | Result matches the explicitly adopted degraded-mode policy, with observable limitation |
| Alternate route or local account | Selected bypass hypothesis is evaluated within approved scope; remaining coverage is explicit |
| Emergency access and expiry | Activation authority, limited scope, traceability and return to normal controls can be verified |
| Failure/recovery of a shared component | Service dependencies and approved recovery behavior are assessed without assuming redundant capacity |
The proposed plan should specify evidence retention and handling, reversibility or recovery needs, and any impact requiring mission-owner agreement. Exact thresholds, durations and acceptable outcomes remain client decisions. No test, scan, agent installation or production connection occurs under this preparation module. Missing testing authority does not prevent documenting the plan; it prevents presenting the plan as executed.
Reference and scope
Exact source, applicability and boundary
Proposed validation
Evidence needed; no execution claim
Client decision
Owners, dependencies and acceptance record
Product selection or a completed template does not establish control effectiveness or authorization.
6. Deliver a traceable package and an explicit completion sequence
The turnover contains five integrated artifacts: applicability/current-state trust register; access/data-flow and responsibility views; gap/exception register; policy/design options and proposed validation plan; prioritized preparation handover. Editable working templates and read-only prompts accompany this guide in plus-delivery/turnover/zero-trust/. Blank values mean unknown or unagreed, never zero risk or automatic acceptance.
Link each material item as requirement/recommendation → exact source → client applicability → flow/evidence → local decision/action → owner → dependency → acceptance evidence. Identify policy, evidence, design and implementation gaps separately. Assign an owner or record an ownership gap; explain what can proceed, what is held and what fact would change the recommendation. Sequence acquiring evidence, resolving authority, evaluating existing tools and any later acquisition/integration/configuration. Avoid turning a roadmap or indicative module duration into a delivery commitment.
Submission includes version, date, evidence limits and a matrix against agreed criteria. Named reviewers classify comments as an in-scope deficiency or a new request; record the disposition and corrections. Written artifact acceptance identifies the version, accepted criteria and outstanding items. Silence, elapsed time or workshop attendance does not count. A receiving owner can accept a complete gap register while the underlying operational risk remains unresolved.
Handover is ready when selected-flow coverage is explicit, sources and applicability are traceable, material uncertainty remains visible, options are qualified, validation is clearly proposed, and every material item has a decision, owner or documented hold. The receiving custodian acknowledges maintenance responsibility and review triggers such as policy, identity, boundary, dependency or product changes. Artifact acceptance does not authorize implementation, accept security risk, approve inheritance or grant ATO/cATO. The appropriate client authorities retain those decisions.